The new ESX host have lots of free space and RAM.
And i have just checked the Server01, which is the one being converted P2V. And its only using about 50-60 percent of its resources.
Server02 which is the server VMWare converter is installed on, is only using 70-80 percent.
Not sure what you mean about "only reconfig task".
Thanks.