I apologize if this is something that has been answered before, but I could not find any reference to it and I feel like I'm just missing something very simple. I recently started working with the newest version of Converter and the problem I'm running into is it will not let me uncheck the perform final synchronization. I can put a check in the option to synchronize, but everything else below that is greyed out. If I uncheck the synchronize option, of course it does not give me the option to perform a sync after doing the p2v process. Could someone please explain to me why this is doing that.
↧